| Order Date | Court/Tribunal | Bench | Subject | Remarks | ||
|---|---|---|---|---|---|---|
| 05-Mar-2024 | NCLT | Mumbai Bench |
In the matter of Awate Engineering Pvt. Ltd. {IA/10/2024 in C.P. (IB)-492(MB)2018] (392.53 KB) |
Liquidation | ||
| 06-Aug-2020 | NCLT | Mumbai Bench |
In the matter of Awate Engineering Pvt. Ltd. [IA 1095/2020 in CP(IB)/492/MB/2018] (406.38 KB) |
Confirmation of RP | ||
| 20-Mar-2020 | NCLT | Mumbai Bench |
In the matter of Awate Engineering Private Limited [CP (IB) 492/MB/2018] (416.54 KB) |
Admission Final order | ||