| Orders Date | विषय | Orders Remarks | 
|---|---|---|
| 07 Mar, 2019 | In the matter of Manogayan Estates Pvt. Ltd.  C.P. No. IB-172(PB)-2019   | Consolidation | 
| 07 Mar, 2019 | In the matter of Delhi Control Devices Pvt. Ltd. (IB)-1567(PB)-2018   | Withdrawn | 
| 07 Mar, 2019 | In the matter of The Indure Pvt. Ltd. (IB) 1633(PB)-2018   | Dismissed | 
| 07 Mar, 2019 | In the matter of Shiva Texfabs Ltd. CP (IB) No. 370-Chd-Pb-2018   | Withdrawn | 
| 07 Mar, 2019 | In the matter of Chhotanagpur Rope Works Pvt. Ltd. CP (IB) No. 1035-KB-2018   | Withdrawn | 
| 07 Mar, 2019 | In the matter of Samaara Leathers Pvt. Ltd. IBA-140-IB-2019   | Withdrawn | 
| 07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-1663(PB)-2018   | Withdrawn | 
| 07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-234(PB)-2019   | Withdrawn | 
| 07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-1012(PB)-2018   | Withdrawn | 
| 07 Mar, 2019 | In the matter of TSN Ecotech International Private Limited MA-6-IB-2019 in CP-302-IB-CB-2018   | Liquidation |