Orders Date | विषय | Orders Remarks |
---|---|---|
02 Apr, 2019 |
In the matter of Reliable Heavy Engineering Nasik Pvt. Ltd. CP(IB) 3165 (MB)-2018 ![]() |
Withdrawn |
02 Apr, 2019 |
In the matter of Patel Engineering Ltd. C.P. (IB)-3777 (MB)-2018 ![]() |
Withdrawn |
02 Apr, 2019 |
In the matter of Fourth Dimension Solutions Ltd. (IB)-29(ND)-2019 ![]() |
Admitted |
02 Apr, 2019 |
in the matter of Applied Electro Magnetics Pvt. Ltd. CA 371-C-II-2018 In (IIB)-334(ND)-2017 ![]() |
Resolution |
02 Apr, 2019 |
In the matter of MSA Developers Pvt. Ltd. (IB)-1304(PB)-2018 ![]() |
Withdrawn |
02 Apr, 2019 |
In the matter of Surya Pharmaceuticals Ltd. (IB)-904(PB)-2018 ![]() |
Extension |
02 Apr, 2019 |
In the matter of ACN Digital Pvt. Ltd. C.P. (IB) No. 610-9-NCLT-AHM-2018 ![]() |
Withdrawn |
02 Apr, 2019 |
In the matter of Bumi Geo Engineering Ltd. CP-928-IB-2018 ![]() |
Withdrawn |
02 Apr, 2019 |
In the matter of AP Coated Drums & Barrels Pvt..Ltd. C.P. No.(IB) 1365(MB)-2018
![]() |
Withdrawn |
01 Apr, 2019 |
In the matter of Supreme Infrastructure India Ltd. C.P. No.(IB)3623(MB)-2018 ![]() |
Others |