Orders Date | Subject | Orders Remarks |
---|---|---|
07 Mar, 2019 | In the matter of Lakshya Realinfra Pvt. Ltd. (IB)-03(PB)-2019 | Withdrawn |
07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-24(PB)-2019 | Withdrawn |
07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-234(PB)-2019 | Withdrawn |
07 Mar, 2019 | In the matter of Orris Infrastructure Pvt. Ltd. (IB)-1012(PB)-2018 | Withdrawn |
07 Mar, 2019 | In the matter of Benaka Sponge Iron Private Limited C.P. (IB) No. 166-BB-2018 | Admitted |
07 Mar, 2019 | In the matter of TSN Ecotech International Private Limited MA-6-IB-2019 in CP-302-IB-CB-2018 | Liquidation |
07 Mar, 2019 | In the matter of Photon Energy System Limited I.A. No. 160-2019 in CP (IB) No. 231-9-HDB-2018 | Settled |
06 Mar, 2019 | In the matter of Welcome Distilleries Pvt. Ltd. C.P.(IB)-3284-(MB)-2018 | Admitted |
06 Mar, 2019 | In the matter of Shree Mataji Graphics Pvt. Ltd. C.P. No.1738-I&BP-2018 | Admitted |
06 Mar, 2019 | In the matter of Stallion Tyres Ltd. C.P.(IB) No. 79-9-HDB-2019 | Withdrawn |