| Orders Date | Subject | Orders Remarks | 
|---|---|---|
| 06 Feb, 2019 | 
         In the matter of RCM Infrastructure Limited C.P (IB) No. 109-07-HDB-2018   | 
      
      Withdrawn | 
| 06 Feb, 2019 | 
         In the matter of EPC Projects and Technical Services Limited CP (IB) No. 531-9-HDB-2018   | 
      
      Withdrawn | 
| 06 Feb, 2019 | 
         In the matter of UTC Softech Pvt. Ltd. (IB)-1100(PB)-2018   | 
      
      Withdrawn | 
| 06 Feb, 2019 | 
         In the matter of SR Foils and Tissue LImited (IB)-144(PB)-2017   | 
      
      Others | 
| 06 Feb, 2019 | 
         In the matter of Suzlon Energy Ltd. C.P (I.B) No.134-NCLT-AHM-2018   | 
      
      Dismissed-existence Of Dispute | 
| 06 Feb, 2019 | 
         In the matter of Neelachal Ispat Nigam Limited C.P.(IB) No.248-KB-2018   | 
      
      Admitted | 
| 06 Feb, 2019 | 
         In the matter of Hi Tech Butterfly Valves India Private Limited C.P. No.(IB) 105-9-NCLT-AHM-2018   | 
      
      Admitted | 
| 06 Feb, 2019 | 
         In the matter of Akshaya Pvt. Ltd. CP-1078-IB-2018   | 
      
      Dismissed | 
| 06 Feb, 2019 | 
         In the matter of Matrix Boilers Pvt. Ltd. CP-1500-IB-2018   | 
      
      Dismissed-cost Imposed | 
| 06 Feb, 2019 | 
         In the matter of Amrit Feeds Ltd. CP(IB) No. 534-KB-2018   | 
      
      Consolidation |